Urgence gaz 0 800 028 800

Transport du gaz
2020-2027
Built in 1974, the pipeline connecting the municipalities of Villaries (31) and Albi (81) is due to undergo a renewal project in order to ensure its safety and to maintain our gas transport grid. In order to comply with the regulatory and technical requirements, Teréga has decided to modernise and adapt the pipeline located between the municipalities of Villariès (31) and Albi (81).
The REVA project thus meets several objectives:
With more than 70 km of pipeline to renew between the municipalities of Villariès (31) and Albi (81), the REVA project (Villariès-Albi Renewal) meets the challenge of modernising and securing our gas transport infrastructures in Occitanie. Built in 1974, the pipeline connecting the two municipalities needs to be replaced in order to meet the regulatory and technical requirements. As for all projects for renewing and modernising our infrastructure, Teréga is contributing to the development of the regions. For the REVA project, this includes connecting a methanisation station (Trifyl) and connecting an NGV station within the municipality of Saint-Sulpice-la-Pointe (81).


